The short answer

Construction Debris$120
Drywall (per sheet / small bundle)$37
Lumber / Wood Scrap (bundle)$41
Tile / Flooring (per box or bundle)$33
Hardwood / Laminate Flooring (bundle)$41
Carpet (rolled)$68
Carpet -- removal (per room)$71
Concrete / Masonry Debris (per 1/4 truck)$219
Roofing Shingles (per bundle)$48

For mixed loads the truck ladder is usually simpler: quarter $241, half $431, three-quarters $587, full $732.

What DC renovates

This region renovates more, and more repeatedly, than most. The dominant project types generate predictable debris.

The rowhouse rear addition. The classic Capitol Hill, Shaw, Petworth and Bloomingdale move -- push the back of the house out, open the kitchen. Generates demolition brick, lumber, drywall and a kitchen's worth of cabinets.

The English basement conversion. Turning a damp cellar into a rentable below-grade unit. Generates masonry, old framing, a bathroom rip-out and a great deal of accumulated household material nobody had looked at in twenty years.

The suburban kitchen and bath. Bethesda, Silver Spring, Arlington, Falls Church, Vienna, Annandale. Cabinets, countertops, tile, fixtures.

The condo refresh. Ballston, Rosslyn, Bethesda, Navy Yard. Flooring, a bathroom, a kitchen -- all of it through a freight elevator.

The kitchen rip-out

The most common single booking in this category.

Full Kitchen Cabinet Set (rip-out)$293
Kitchen Cabinet -- base (per unit)$67
Kitchen Cabinet -- upper (per unit)$48
Countertop -- laminate (per section)$56
Countertop -- stone / granite (per section)$111
Sink (kitchen / utility)$61
Range Hood / Vent$53
Garbage Disposal Unit$47

A Bloomingdale rowhouse kitchen going out whole -- cabinet set, two stone countertop sections, the sink -- is $293 + $111 + $111 + $61 = $576. Add the old refrigerator at $164 and the electric range at $134 and it prices as a single visit.

The bathroom rip-out

Bathtub (fiberglass)$90
Bathtub (cast iron)$185
Toilet (detached)$64
Toilet (attached / needs disassembly)$192
Bathroom Vanity$69
Shower Door / Glass Enclosure$71
Shower Stall / Kit$115
Medicine Cabinet$41

The cast iron tub at $185 is a DC item. Older rowhouses and pre-war apartment buildings across the Hill, Mount Pleasant, Woodley Park and Cleveland Park are full of them, they are genuinely heavy, and they are usually on the second floor at the top of a stair that turns. It comes out anyway, and there is no stair charge.

Why a container often is not the answer here

In the suburbs, put a roll-off in the driveway and forget about it. In the District's rowhouse core there frequently is no driveway, and the street is permit-parked public space where placing a container is a permitted activity rather than a decision. Check your own jurisdiction's current requirements before planning around one -- they differ across the District, Montgomery County, Prince George's County, Arlington, Alexandria, Falls Church and Fairfax.

Historic districts add a second reason. Georgetown, Capitol Hill, Sheridan-Kalorama, Mount Pleasant, LeDroit Park and Old Town Alexandria have brick sidewalks, street trees and neighbors who notice a container sitting on the frontage for three weeks.

So the pattern that works is staged booked removals: demolition debris goes when demolition finishes, the next phase's material goes when that phase does. No permit, no container, and a 16-foot-wide house stays workable.

Separating on site

Worth the effort because the streams are genuinely different, and because a sorted pile loads faster.

  • Clean wood -- framing offcuts, old joists, trim. Bundle it. $41 a bundle.
  • Drywall -- keep it dry and stacked, not mixed into the wood. $37 a sheet or small bundle.
  • Masonry and concrete -- heavy and separate. $219 per quarter truck.
  • Metal -- old radiators at $123, pipe, ductwork, appliance cases. The most reliably recovered stream on any renovation.
  • Fixtures worth reusing -- solid cabinet runs, good doors, intact vanities. Set them aside before demolition rather than after.

Mixed piles still get taken; sorted ones just recover better and move faster.

Condo and high-rise renovations

If the project is in a managed building in Ballston, Rosslyn, Bethesda, Tysons, Navy Yard or the Wharf, the building governs everything.

  • Certificate of insurance naming the association and management company, sent to the office days ahead. Produced at no charge.
  • Reserved freight elevator with a hard window, frequently weekday-only.
  • Loading dock access and often a clearance bar on the garage entrance.
  • Corridor and elevator protection, which the building will specify.

Plan debris removals into the elevator slots you can actually get, and book them in a sequence rather than hoping for one large day at the end.

Booking it well

Photograph the pile before each removal and say what is in it -- wood, drywall, masonry, tile, fixtures. That gets you a number before the crew is scheduled rather than a discussion on site.

Say the block and the access. Alley access behind Petworth, Brookland and Hill East rowhouses usually works; Georgetown and Sheridan-Kalorama alleys usually do not take a box truck, so the crew carries to the street. Permit parking and rush-hour standing restrictions shape the window.

And schedule around the trade calendar: debris out on the day between demolition and the next trade starting, not on the day the drywall crew needs the room.

Frequently asked questions

How much does renovation debris removal cost in DC?

Construction debris is $120, drywall $37 a sheet or small bundle, lumber scrap $41 a bundle and concrete or masonry $219 per quarter truck. Mixed loads often price better on the truck ladder -- $241 a quarter, $431 a half, $732 full.

Can I use a dumpster instead on a rowhouse block?

Often not easily. There is usually no driveway, the street is permit-parked public space, and placing a container there is a permitted activity. Check your jurisdiction's current requirements. Staged removals avoid the problem entirely.

Do you take a full kitchen rip-out?

Yes. A full cabinet set is $293, individual base cabinets $67 and uppers $48, laminate countertop sections $56 and stone sections $111. Old appliances price separately -- $164 for a standard refrigerator.

What about a cast iron bathtub on the second floor?

$185, and there is no stair charge. These come out of older rowhouses and pre-war apartment buildings across the city constantly, usually down a stair that turns at the landing.

Can you work in a condo building?

Yes. It needs a certificate of insurance naming the association and management, produced at no charge, plus a reserved freight elevator window from the management office. Plan removals into the slots the building will actually give you.